Test Equipments for Electrical Energy Meters


We design and manufacture test equipments and automation solutions for calibration, type testing and production of electrical energy meters as per IEC 62053, IS 14697, IS 13779, SASO 1823 & other harmonised standards.
Some of our recent solutions are listed here. Please write to us for more details.

PC based Calibration bench for Electrical Energy Meters

This is a PC based system which facilitaltes to calibrate number of meters at a time e.g. 5, 10, 20, 40, 60 or 80 resulting in speedy testing. Different Systems are available for single phase as well as three phase electrical energy meters. The entire test sequence is programmed and is controlled by customisable Testware running on PC. The operator has to select the type of energy meter (model or SAP code) to be tested once on starting the bench, and then just load the energy meters in the jigs (electro-pneumatic fixtures).
The accompanying PC based Testware is intuitive, has secured database and exports reports easily for statistical analysis such as pareto analysis, bell-curve etc.


MAIN FEATURES AT A GLANCE:
The bench comprises of:
  1. Power Source.
  2. Micro-controller based error calculation module.
  3. Sensors at each station.
  4. Reference meter.
  5. PC with software for control & reporting.


PC based Full-Range Accuracy Check Test Equipment
This is another option for testing electrical contactors manually.
The tests that can be performed are:
  1. Full-range accuracy check.
  2. Starting current Test.
  3. No Load (creep) Test.
  4. Repeatability of accuracy Test.
  5. Meter constant Test.
  6. Dosage Test.
The bench comprises of:
  1. Power Source.
  2. Micro-controller based error calculation module.
  3. Sensors at each station.
  4. Reference meter.
  5. PC with software for control & reporting.


Short Time Over-current Test Equipment
Short-time Over-current Test Equipment is used to measure and analyze the influence of short-time overcurrents on energy meter. This test is described in various standards for energy meters such as IEC 62053, IS 13779.
As per IEC / CEI 62053, short-time 'overcurrents' shall not damage the meter. The meter shall perform correctly when back to its initial working condition and the variation of error will not exceed particular values specified in the standard on basis of the class of the energy meter.
The Short-time Over current Test Equipment is suitable for testing the influence of Short-time over-currents on all types of energy meters that should confirm to or exceed the requirements of national and international standards. STOC 01/02 is appropriate for use by test laboratories, research & development centers & manufacturers for conformity assessment services, research and type testing. This test is mandatory for electronic and electromechanical energy meters supplied to energy distribution companies.
The STOC 01/02 briefly consists of a power circuit and a control panel. The power circuit feeds the ‘overcurrent’ to the meter. The control panel provides the user interface to adjust the parameters as per the requirements of the standards and the meter.
The user can set the exact time duration or number of cycles on the control panel for which the required current value is to be fed to the energy meter.

Specifications of the available models
# Aspect STOC 1 STOC 2
       
1 Input Supply Default: Three phase, 415V, 50Hz, +/- 10%, (40A max)
(Adjusted as per client’s national standard)
Default: Three phase, 415V, 50Hz, +/- 10%, (100A max)
(Adjusted as per client’s national standard)
2 Output Current Range 50 to 5000A variable, controlled, settable and isolated from mains
Two Ranges:
50-500A
100-5000A
100 to 10000A variable, controlled, settable and isolated from mains
Two Ranges:
100 – 1000A
200 – 10000A
3 Output Current Setting 150A to 500A : 10ms
Above 500A : 500ms
200A to 1000A : 10ms
Above 1000A : 500ms
4 Compliance Voltage 5V 7V
5 Output Measurement Through Transient Recording Meter; Facility is provided to connect an oscilloscope to measure and set the desired output current.
Two ranges provided:
0 – 300mV for 0 – 500A O/P Tap
0 – 300mV for 0 – 5000A O/P Tapd
Through Transient Recording Meter; Facility is provided to connect an oscilloscope to measure and set the desired output current.
Two ranges provided:
0 – 300mV for 0 – 1000A O/P Tap
0 – 300mV for 0 – 10000A O/P Tap
6 Time Setting
Cycle Setting
10ms to 1000ms
1 cycle / 99 cycles
10ms to 1000ms
1 cycle / 99 cycles
7 Protection Fuse protection on primary side.
Electronic Over Current Protection in Primary Circuit.
Additional Time Limit for “Test ON” time.
Fuse protection on primary side.
Electronic Over Current Protection in Primary Circuit.
Additional Time Limit for “Test ON” time.
8 Termination Output current termination on bus bars to facilitate easy connection with Energy Meter current circuit terminals.
Three bus bar, Common, 500A & 5000A are provided.
Output current termination on bus bars to facilitate easy connection with Energy Meter current circuit terminals.
Three bus bar, Common, 1000A & 10000A are provided.
9 Current Sensing Through Shunt:
0 – 300mV for 0 – 500A Output.
0 – 300mV for 0 – 5000A Output.
Through Shunt:
0 – 300mV for 0 – 1000A Output.
0 – 300mV for 0 – 10000A Output.


Influence of Supply 'Voltage Dip' Test Equipment

Influence of Supply Voltage Test Equipment ‘ISVT 01’ is used to measure and analyze the influence of supply voltage on energy meter. This test is described in various standards for energy meters such as IS 13779, IEC 62053 etc.
As per IEC 62053-21, IS 13779 clause 12.7.2, the test should be carried out under the following conditions:

In accordance with IS 13779 clause 12.7.2 & IEC 62053-21, this test equipment will perform:
  1. Voltage Interruption of 100%:  On pushing button 'A', the test will be as follows:
    1. Interruption time : 1s
    2. Number of interruptions: 3
    3. Restoring time between interruptions : 50 ms
  2. Voltage Interruption of 100%: On pushing button 'B', the test will be as follows:
    1. Interruption time: 20ms
    2. Number of interruptions: 1
  3. Voltage Interruption of 50%: On pushing button 'C', the test will be as follows:
    1. Dip time : 1min
    2. Number of dips: 1


Impulse Tester

Impulse Tester to carry out verification of Impulse Voltage (across clearance and across solid insulation) as per IEC 60065.

Features:

Magnetic Coils (Test jigs for abnormal magnetic induction)

These are test jigs for



Phantom Loads
Phantom Load (Test Setup) for Single Phase Energy Meter

The test bench comprises of

For testing 3-phase energy meters, 3 such set-ups are housed in a single unit.

 Three Phase Power Source / Phantom Load unit

This set-up is used for production test of energy meters. It is normally multi-station, such as a 40 station test set-up.